KINHAR ENERGY - AC EV CHARGER SAMPLE CONFIGURATION & DOCUMENT REVIEW Blank reusable record | Revision 2026-10-23 Purpose: Link an exact sample to its quotation, configuration and available documents. Use one record per configuration. This is identity/document review, not a test report, electrical procedure, certification or operational approval. Do not energise, open or modify equipment to complete this record. 1. SAMPLE IDENTITY Buyer / project: Review date / reviewer: Destination market / intended application: Quotation or specification reference / revision: Buyer-facing model / supplier model mapping: Sample ID / serial or batch / received date: Hardware / firmware revision, if documented: Nameplate and sample photograph references: 2. CONFIGURATION - AGREED REFERENCE, RECEIVED RECORD AND DIFFERENCES Supply voltage / phase / current / stated output: Agreed reference: Sample record / differences: Vehicle connector / supply-side connection (record separately): Agreed reference: Sample record / differences: Cable length / supplied items / accessories: Agreed reference: Sample record / differences: Ordered functions (only features included in this quotation): Agreed reference: Sample statements / documents / unresolved differences: Branding / nameplate / manual / packaging revisions: Agreed reference: Sample record / differences: A similar enclosure or headline kW value is not a complete configuration match. Optional features are not automatically included. Supplier statements are not verified results. Any performance evaluation needs a separate qualified record. 3. DOCUMENT REGISTER For every entry record: title, identifier, revision, issuer/responsible entity, applicable model/configuration, review note and status. Status choices: Pending / Reference matched / Difference noted / Not in scope. Datasheet / manual: Destination-market documents requested for this order: Quoted item list / artwork: Separate agreed evaluation records (provider, date, sample scope): OCPP protocol version / firmware / CSMS / evidence reference, only if ordered: A reference standard, certificate, declaration and test report are not the same record. A feature option is not OCPP certification. If certification is claimed, retain its identifier and verify the relevant product/software scope with OCA. 4. OPEN POINTS AND NEXT REVIEW Open item / required evidence / responsible party / target date: 1. 2. 3. Record status: Incomplete / Awaiting clarification / Ready for separate technical review / Document review complete. Next review date / record revision: Document review complete is NOT operational or production release. It does not approve electrical safety, performance, installation or market access. Agree further assessment and change control separately; link changes to a new revision. Save your own local copy. This file has no submission action and does not send your entries to KinHar. Do not add passwords, private keys or backend credentials. KinHar related resource: https://www.kinharenergy.com/ev-charger-bulk-pricing.html Public sales contact: sales@kinharenergy.com Independent scope references (not endorsement/certification of KinHar): https://www.dekra.com/en/ev-charging-station-and-infrastructure-testing/ https://openchargealliance.org/certified-companies/ Prepared by KinHar Energy, an EV charging equipment supplier with OEM/ODM support. This blank record contains no completed measurements or certified results.